Well Contractor Exam · Free practical tool

Pumping and recovery log

Keep timed pumping and post-stop recovery measurements on a common datum. Plot the observed response without fitting an unsupported aquifer model.

Free results and workingNo signupLocal calculations
Your inputsCalculated on your device

Example values loaded. Replace them with your own measurements.

Test measurements
Entry 1
Entry 2
Entry 3
Entry 4
Your result
↗

Make the numbers make sense.

Enter your values, choose the units, and calculate. You’ll see the result and the working here.

Free results. No account needed.

The method

Drawdown at each time = measured depth − static depth; label pumping/recovery using the supplied pump-stop time.

Before using the result

  • Common datum and representative timed readings. Logs do not fit an aquifer model or establish sustainable well yield.

Worked examples

These original training examples illustrate the method for NGWA Certified Well Driller (CWD) General Drilling Examination. Use the matching “Load example” button above to explore a variation; example values are not equipment settings or prescribed criteria.

1. Worked example

Keep timed pumping and post-stop recovery measurements on a common datum. Plot the observed response without fitting an unsupported aquifer model.

Test date
2026-10-01
Static water depth below datum
10 m
Pump-stop elapsed time
60 min
Supplied test measurements
Elapsed time (min)Depth below common datum (m)Measured pumping flow (L/s)
0102
30142
60150
90120
  1. Drawdown = measured depth − 10 m.
  2. Pump stop at 60 elapsed minutes.
  • Measurements: 4
  • Test date: 2026-10-01

2. Comparison example

Compare a different supplied condition using the same method. For Well Contractor Exam, the important check is that the input meaning, units and method assumptions still match the problem.

Test date
2026-10-01
Static water depth below datum
9 m
Pump-stop elapsed time
60 min
Supplied test measurements
Elapsed time (min)Depth below common datum (m)Measured pumping flow (L/s)
0102
30142
60150
90120
  1. Drawdown = measured depth − 9 m.
  2. Pump stop at 60 elapsed minutes.
  • Measurements: 4
  • Test date: 2026-10-01

Check your understanding

1. Which relationship is used?

Drawdown at each time = measured depth − static depth; label pumping/recovery using the supplied pump-stop time.

2. Which assumption should you check first?

Common datum and representative timed readings. Logs do not fit an aquifer model or establish sustainable well yield.

3. How should you verify a different unit system?

Convert every input to the displayed calculation units first. Equivalent physical inputs must give equivalent results; a unit label alone does not convert a number.

Continue with the matching exam topic

This tool connects to NGWA Certified Well Driller (CWD) General Drilling Examination free practice. Work through a question independently, then use the calculation steps to identify where your method differs. The tool stays free whether or not you choose paid preparation.

Pumping and recovery log — free with working | Well Contractor Exam